Welcome: AOB Digital Energy Technology(Nan Jing) Co., Ltd
Language: Chinese ∷  English
Your location: Home > News

News

How to match the discharge time of commercial UPS with the battery specifications (series/parallel)?

How to match the discharge time of commercial UPS with the battery specifications (series/parallel)?

The matching of the discharge time of commercial UPS with the battery specifications (series/parallel) mainly depends on the following factors:

  • The power of UPS

  • The discharge time requirement of UPS

  • The capacity of the battery

  • The voltage of the battery

Calculation formula

The discharge time of UPS can be calculated according to the following formula:

Discharge time = Battery capacity / UPS power * Battery efficiency

Where:

  • Battery capacity: Unit is ampere hour (Ah)

  • UPS power: Unit is watt (W)

  • Battery efficiency: Generally take 0.8

Series/parallel connection

The series/parallel connection of batteries will affect the capacity and voltage of batteries.

  • Series connection: The voltage of the battery will increase, and the capacity will remain unchanged.

  • Parallel connection: The capacity of the battery will increase, and the voltage will remain unchanged.

Example

Assume that the power of a UPS is 700W, the discharge time requirement is 10 minutes, and the cut-off voltage of the battery is 1.67V/CELL.

Calculation steps

  1. Calculate the battery capacity:

Battery capacity = UPS power * Discharge time / Battery efficiency= 700W * 10 minutes / 0.8= 875Wh


CATEGORIES

CONTACT US

Contact: Albert Shu

Phone: 19710409880

Tel: 400-1177-032

Email: 19710409880@139.com

Add: Room A781, No. 2 Dingjiashan Road, Dachang Street, Jiangbei New District, Nanjing City, Jiangsu Province, China